Data center technician interview questions (with answers)

Twenty-two questions a hiring manager asks a datacenter technician: power chain, UPS and PDU, A and B feeds, cooling, PUE, racks, Redfish and SNMP, lockout, incidents, and change windows. Short answers, with links to free Academy lessons.

November 20, 202618 min readDr Durairaj Karthikeyan

These are questions a hiring manager asks a datacenter technician or a critical-facilities operator. They cover the power chain, UPS and PDU, A and B feeds, cooling, PUE, racks and cabling, out-of-band management, safety, incidents, and change windows. The answers are short on purpose. Where a free Academy lesson covers the same topic, the practice link under the question opens that lesson.


Power chain, UPS, and feeds

Q1: Walk the power path from the utility feed to a server.

Utility, often 11 kV or 33 kV, lands on the building transformer. The transformer feeds the main low-voltage switchgear. An automatic transfer switch selects utility or generator. The UPS rectifies that AC to DC, holds a battery on the DC bus, and inverts back to AC. A floor PDU or remote power panel breaks the UPS output into branch circuits. The rack PDU feeds the server power supply. Ask where a single failure drops the IT load. In a 2N hall each UPS path can carry the full IT load. In an N+1 hall one extra unit covers one failed unit, not a whole second path.

Practice this

Q2: Utility voltage collapses. What does the UPS do in the first seconds, and what does it not do?

On a double-conversion UPS the inverter is already feeding the load, so the servers do not see a transfer. The rectifier stops and the batteries hold the DC bus. That bridge is there until the generator is at voltage and the transfer switch has moved the UPS input onto the generator, often 10 to 15 seconds. A line-interactive UPS is different: it passes utility through and switches to battery, which takes a few milliseconds. Either way the UPS is not the all-night source. If the generator does not accept the load, you are on battery autonomy only.

Practice this

Q3: What is the difference between a floor PDU and a rack PDU?

A floor PDU, sometimes called a remote power panel, takes the UPS output and splits it into breaker-protected branch circuits, with a meter if it is an intelligent unit. A rack PDU is the strip in the cabinet. It feeds server power supplies through C13 or C19 outlets. An intelligent rack PDU reports current per outlet or per phase. A basic strip does not. The breaker that opens is usually the branch breaker or the rack strip, not the utility main.

Practice this

Q4: A server has an A cord and a B cord. What has to be true before you call that redundant?

A and B have to come from different UPS paths. Two breakers on the same PDU are not A and B. Each path has to be able to carry the whole rack if the other path dies. While both are up, the power supplies usually share the load near half and half. Before you open anything on A, confirm B is live, the B supplies are healthy, and the B breaker and UPS have room for the full rack. Two cords plugged into one strip are a labeling exercise, not a second feed.

Practice this


Cooling and aisles

Q5: What is a hot aisle and a cold aisle, and why does containment matter?

The cold aisle is where the server inlets face each other and take supply air. The hot aisle is where the exhausts face each other. If those streams mix, the cooling unit sees a lukewarm return and the servers see their own exhaust. Containment keeps them apart. Hot-aisle containment sends the exhaust back to the cooling units and leaves the room cooler for people working in it. Cold-aisle containment boxes the supply air and lets the rest of the room run hot. Blanking panels in empty rack units stop exhaust from falling into the inlet through an open U.

Practice this

Q6: Is the unit in the hall a CRAC or a CRAH, and why does that change the fault you look for?

A CRAC has its own compressor and refrigerant circuit. If it stops making cold air, look at that unit: compressor, fans, and filters. A CRAH is a fan and a chilled-water coil. The cooling work happens at the chiller. If a CRAH is moving air and the supply is still warm, check the valve and the chilled-water temperature before you condemn the fan. At hall scale a central chiller usually uses less electricity per unit of cooling than a row of small CRAC compressors. A small edge room often uses CRACs because a chiller plant is too much equipment for the load.

Practice this

Q7: Server inlet temperature is climbing in one rack. What do you check first?

Confirm it is not one bad sensor. Compare that rack with the rack beside it and with the cooling-unit supply reading. Then look at the unit serving that row: fan running, chilled-water valve open, filter pressure drop not pegged. If the whole row is warm, look at the water temperature from the plant. If only one rack is warm, look for a missing blanking panel, a cable bundle across the inlet, or a solid floor tile where a perforated tile belongs.

Practice this


PUE

Q8: The site says its PUE is 1.5. What does that number actually say?

PUE is total facility power divided by IT equipment power. A PUE of 1.5 means 1.5 kW enters the building for each 1 kW that reaches the IT gear. The other 0.5 kW is cooling, UPS and distribution loss, lights, and the rest of the house load. It is an average over a period, not a live setpoint. Ask where IT power is metered and whether the figure is a year or a single cool afternoon. A lower number is better. A number that moved because someone changed the meter boundary is not a better hall.

Practice this

Q9: Name work on the floor that actually moves PUE.

Fit blanking panels and close containment gaps so supply air and exhaust stop mixing. Raise the supply temperature while server inlets stay inside the range the gear is rated for, so the plant does less work. Slow the CRAH fans once the aisle is contained and the inlets are still safe. Do not chase the number by reclassifying mechanical load as IT load.

Practice this


Racks and cabling

Q10: A rack is drawing 8 kW and each of its two rack PDUs is rated 5 kW. Is that redundant?

No. While both feeds are up, each strip may sit near 4 kW and look fine. If A dies, B is asked for 8 kW and a 5 kW strip trips. Each cord, each strip, and each upstream breaker has to carry the full rack on its own. Read the measured draw, not only the nameplate, before you add gear. A design of 5 kW per rack does not become an 8 kW rack because the servers posted.

Practice this

Q11: Where do you refuse to leave a cable bundle?

Across a server inlet, or in a pile under the cold aisle of a raised floor. Both block supply air. The exhaust side can carry data cabling if it does not stop the hot air leaving the rack. Power cords should be labeled at both ends with the rack and the breaker, so the next person can open the right one. A solid floor tile in a cold aisle is a cooling defect, not a tidy floor.

Practice this


Redfish, IPMI, and SNMP

Q12: What are IPMI and Redfish, in practical terms?

Both are out-of-band management on the server, on a management port, not on the data ports the workload uses. IPMI is the older interface on the baseboard management controller. It shows power state, sensors, and a remote console when the operating system is down. Redfish is the newer HTTP and JSON interface for the same job, and current servers, rack PDUs, and power shelves speak it. A technician uses it to confirm a box is powered and to read inlet temperature. Treat that network as its own access domain. You do not run the production workload over it.

Q13: What would you poll with SNMP on a UPS or a rack PDU?

SNMP reads named values on a schedule, and the device can send a trap when a threshold trips. On a UPS, read load percent, input and output voltage, battery time remaining, and the alarm state. On a rack PDU, read current per phase and, on a metered strip, per outlet. Version 2c is still common on older gear and has a shared community string. Version 3 adds authentication. A poll tells you the number. Opening a breaker is still a deliberate act on the gear or in a controlled outlet command, not something you do because a graph looks high.


Safety and lockout

Q14: You have to open a PDU or rack out a breaker. What has to be true before the cover comes off?

Lockout and tagout. Find every source that can energize the gear, including the second feed on A/B equipment. Open the breaker, lock it, tag it with your name, and verify zero energy with a meter on the conductors you are about to touch. A UPS DC bus and the capacitors on a drive do not go dead because the AC breaker is open. If you cannot prove it is dead, you do not open it. The arc-flash boundary and the permit are part of the same job.

Q15: A colleague wants to close a tie breaker "just to be safe" while people are working on the A UPS. What do you say?

No, not without the written change and a look at the one-line. Closing a tie can parallel two sources that are not in phase, or it can put the hall on a path that was isolated for a reason. While people are on the A side, B is what is keeping the servers up. You do not change B to be helpful.

Practice this


Incidents

Q16: Utility voltage drops at 02:10. What do you check before you start resetting things?

Confirm the IT load is still up, and note which UPS path is on battery and the time. Watch the generator: crank, voltage, frequency, then the transfer. If the generator is up and the switch has not moved, say that and follow the site procedure for a failed transfer. Do not keep closing a breaker that trips again. Report the equipment name, the alarm text, and what you already verified.

Practice this

Q17: One CRAH alarms "supply temperature high" at 24 °C overnight. Walk the response.

Own the alarm. Compare the neighboring sensors so you know the reading is real. Check that unit's fan, valve, and filter. Check the chilled-water temperature. If the unit is down, confirm the rest of the row is holding inlet temperature. If the water is warm, the plant is the problem, not the face of that CRAH. Escalate before inlets reach the site limit. Write down what you found so the next shift does not start from zero.

Practice this

Q18: You smell hot plastic at a rack. What do you do?

Find the rack and see whether a cord, a plug, or a power supply is hot. If there is smoke or flame, follow the site emergency procedure and get people out of the aisle. If it is a smell and no smoke, and the other feed is healthy, move that server's load onto the healthy feed and open the breaker for the affected strip. Do not leave it for the end of the shift, and do not pull cords under load if you do not know which breaker feeds them.

Practice this


Change windows

Q19: What is a change window, and what do you refuse to do outside one?

A change window is the agreed time when you may take a redundant path or a unit out of service. You write which part of the one-line you will open, how you will put it back, who is on the floor, and how you will prove the remaining path is carrying the load. Outside that window you do not open a UPS module, rack a main breaker, or close a tie because the hall is quiet. Work to stop an active fault is different, and it still gets a log.

Practice this

Q20: Before you isolate the A UPS for maintenance, what do you verify?

B is available and can take the full IT load. Read the B load now, add the A load, and compare that sum with the B rating. Check that dual-corded gear really has a live B cord. Tell the people in the hall. After the transfer, confirm A current has gone to about zero and B has risen by about that amount. Then lock out A. Bring A back in the same window and watch for an overload.

Practice this

Q21: A generator test is on tonight's schedule. What do you watch?

Whether the test is a no-load start or a load run. Watch the start, the time to rated voltage and frequency, and whether the transfer switch moves. On a load test, watch the UPS so you know the battery bridge held, and watch cooling so the mechanical load came across. Record fuel, alarms, and the times. A generator that has not carried load is a guess.

Practice this

Q22: Your shift ends in the middle of an open alarm. What do you hand over?

The alarm text, the equipment name, what you already checked, what is still wrong, and who has been called. "CRAH is weird" is not a handover. "CRAH-3 supply reads 24 °C, the fan is running, the valve is open, chilled water is 14 °C, the adjacent units are normal, and the ticket is open" is a handover. The next person should not have to rediscover it.

Practice this


Take the free Academy track and get the certificate: datacenter Academy.