FDE Day 1: What TAQA & Khazna Engineers Need
💻 Module 1: Terminal, HTTP & Your First API Call
FDE Day 1: What TAQA/Khazna Engineers Need
FDE stands for Field Deployment Engineer. These are the people who show up at a customer site — a TAQA power plant, a Khazna data centre, a DEWA substation — and make the platform work with real equipment.
What Day 1 Looks Like
You arrive at the site. The customer gives you:
- A network IP address for their SCADA system
- Login credentials for their BMS
- A list of meters they want monitored
Your job: connect, read, verify, and report back.
The Pre-Flight Checklist
Before you touch any customer equipment:
# 1. Can you reach the site network?
ping -c 3 192.168.1.100 # Replace with actual site IP
# 2. Can you reach the EnergyAtIt API from the site?
curl -s https://app.energyatit.com/api/v1/health
# 3. Is your API key valid?
curl -s -H "Authorization: eat_live_YOUR_KEY" \
https://app.energyatit.com/api/v1/sites
# 4. Can you reach the Modbus device?
# (If they have a BESS with Modbus TCP on port 502)
nc -zv 192.168.1.50 502What TAQA/Khazna Engineers Care About
- Reliability — Will this work 24/7 without babysitting?
- Latency — How fast do commands reach the device?
- Auditability — Can we prove what happened and when?
- Compliance — Does this meet DEWA/ADDC/SEC requirements?
Every feature you learn in this course maps to one of these four concerns.
The FDE Mindset
The terminal is not just a developer tool. It is a diagnostic tool. When something breaks at 3am, the terminal is how you fix it. The FDE who can SSH into a server and trace a failed dispatch is worth 10x the one who can only click buttons in a dashboard.