📈 Capacity Planning — dc5.6
DC AcademyModule 5: Capacity Planningdc5.6
Reading8 min

Cost Modelling: From DEWA Bill to Total Cost of Ownership

📈 Module 5: Capacity PlanningGrow

Open the Cost Model. See Where Your Money Actually Goes.

You just learned capacity planning theory. Now go see what capacity actually costs — and where the waste is.

Do This Right Now (5 minutes)

  1. Open the Cost Model — go to /cost-model. This is a live tariff calculator built on real DEWA, ADDC, and SEC rate structures. Not estimates from a whitepaper. Actual tariff schedules.
  1. Enter your facility — set it to 10MW in Dubai on DEWA industrial tariff. Hit calculate. See the annual electricity cost: approximately AED 39 million. Look at the breakdown — energy charge, fuel surcharge, demand charge, connection fee. This is real money.
  1. Now improve PUE — change PUE from 1.6 to 1.3. Watch the annual cost drop by AED 5.8 million. That is the business case for every cooling project, every setpoint increase, every containment installation. One number. Print it. Show it to your CFO.
  1. Compare tariffs — switch between DEWA, ADDC, and SEC. See how the same facility costs different amounts in different regions. This is why site selection is a financial decision, not just a technical one.
  1. Project 10 years — use the TCO projection. Factor in 15% annual load growth. See when you need to expand — and what that expansion costs at current tariff rates vs projected rates.

Connect It to the Live Data

After you run the cost model, go to /dc/pue. See the current PUE reading? Now you know exactly what each 0.1 PUE improvement is worth in AED. Go to /procurement — this is where you can model PPA impact on your energy costs, comparing utility tariffs with renewable contracts.

The Meeting That Gets You Promoted

Walk into the next executive review with three screenshots:

  1. Current PUE from /dc/pue — "This is where we are"
  2. Cost model from /cost-model — "This is what it costs us"
  3. Target PUE scenario — "This is what we save"

That is not a PowerPoint. That is a decision.

Go to [/cost-model](/cost-model). Enter your numbers. See where the money goes.