🌍 Gulf Operations — dc7.5
DC AcademyModule 7: Gulf Operationsdc7.5
Hands-on20 min

Hands-on: Run a High-Ambient Drill

🌍 Module 7: Gulf OperationsTest

Hands-on: Run a High-Ambient Drill

This lesson trains Test. Launch opens the High Ambient Temperature guided scenario. The briefing is an outdoor temperature above 50°C, free cooling unavailable, and mechanical cooling at full capacity. It is one drill. It is not a seven-day clock, and it does not send a demand-response curtailment.

What You Will Do

  1. Launch the high-ambient drill. Sign in if asked
  2. Read the briefing before you start: objectives, time limit, and the actions it recommends
  3. Write down the success criteria. If you run the session, write the debrief score
  4. Stop there. Do not look for a humidity slider or a generator-test button in this scenario

What to Take from the Briefing

  • Peak outdoor air in this drill is above 50°C
  • The recommended moves are a lower chiller setpoint, higher fan speed, and watching PUE
  • A PUE above 2.0 is the briefing's own warning line

The CDU lab at /dc/cdu-lab is a different shipped surface: pump, setpoint, and flow at a 42°C design ambient. Use it when you want those three sliders. It is not this drill.

Launch the high-ambient scenario, copy the success criteria, then mark this lesson complete.

Open High-ambient drill

Start the High Ambient Temperature scenario. It is one drill, not a seven-day week.

Launch

Log in to track your progress and earn certifications.