Hands-on10 min
Hands-on: SSH Into a Substation
⚡ Module 1: Power Grid 101
Hands-on: SSH Into a Substation
In this hands-on exercise, you will connect to a simulated substation environment and explore its telemetry data, control interfaces, and protocol endpoints.
Exercise Overview
You will use the EnergyAtIt live dashboard to interact with a simulated 132/33 kV substation. The substation model includes:
- Two power transformers (60 MVA each) with on-load tap changers
- Six outgoing 33 kV feeders with motorized circuit breakers
- Bus section breaker for split-bus operation
- Protection relays (overcurrent, distance, differential)
- Revenue meters on each feeder
Tasks
- Explore the telemetry tree. Navigate the substation's data model in the dashboard. Identify the bus voltage, feeder currents, and transformer loading for each phase. Note how values are organized hierarchically: Substation > Voltage Level > Bay > Device > Data Point.
- Read IEC 61850 data objects. Using the protocol inspector panel, observe the MMS data structure:
- Logical Device:
SUB1_LD0 - Logical Nodes:
XCBR1(circuit breaker),MMXU1(measurement),PTOC1(overcurrent protection) - Data Objects:
MMXU1.TotW(total watts),MMXU1.TotVAr(total VARs),XCBR1.Pos(breaker position)
- Monitor a tap change operation. Observe the transformer tap position changing as the automatic voltage regulator (AVR) adjusts to maintain the 33 kV bus within +/- 5% of nominal. Watch how
ATCC1.TapPosincrements and the bus voltage responds.
- Trigger a breaker trip. Using the control panel, simulate a fault on Feeder 3. Observe the protection relay (
PTOC1) picking up within 50 ms and the circuit breaker (XCBR1) opening within 80 ms. Note the sequence-of-events log with millisecond timestamps.
- Export telemetry as CSV. Download 15 minutes of 1-second resolution data for the main bus and verify the data quality: no gaps, consistent timestamps, values within expected ranges.
What You Will Learn
- How substation telemetry is organized in a hierarchical data model
- The relationship between IEC 61850 logical nodes and physical devices
- How protection operates in real time (pickup, trip, reclose sequences)
- Data quality characteristics of substation SCADA
This exercise uses the Grid Simulator. Click the Launch button below to open the Substation Explorer lab.
Open Hands-on Lab
Complete the exercise in the live dashboard.