Hands-on30 min
Hands-on: Balance a 1 GW Grid
⚙️ Module 4: Grid Operations
Hands-on: Balance a 1 GW Grid
In this hands-on exercise, you will operate a simulated 1 GW power grid, managing generation, storage, and demand response to maintain frequency and voltage within limits over a 24-hour accelerated simulation.
Exercise Overview
The simulated grid represents a mid-size utility with the following resources:
- 2 Gas turbines: 200 MW each, ramp rate 10 MW/min, minimum stable 80 MW
- 1 Solar farm: 300 MW nameplate, output follows a realistic irradiance profile with cloud transients
- 1 Wind farm: 150 MW nameplate, output follows a variable wind profile
- 2 Battery systems: 50 MW / 200 MWh each (4-hour duration)
- 1 Data center: 100 MW load, 20% curtailable via workload migration
- EV charging fleet: 50 MW peak, fully curtailable via OCPP
- Residential/commercial load: 500 MW base, peaks at 700 MW
Total generation capacity: 900 MW (firm) + 450 MW (variable renewable) = 1,350 MW nameplate
Peak load: ~850 MW
Scenarios You Will Face
The 24-hour simulation (compressed to 30 minutes real time) includes:
- Morning solar ramp (6-9 AM): Solar output increases from 0 to 250 MW. Manage gas turbine ramp-down and battery charging to avoid over-frequency.
- Cloud event (11 AM): Solar output drops 150 MW in 2 minutes due to cloud cover. Batteries must respond within seconds; gas turbines ramp up over minutes.
- Afternoon peak (2-5 PM): Load reaches 850 MW while solar begins declining. Dispatch batteries, curtail EV charging, and activate data center DR.
- Evening solar cliff (5-7 PM): Solar drops from 200 MW to 0 in 2 hours. Gas turbines at maximum, batteries discharging. If load exceeds generation, you must curtail demand.
- Wind surge (midnight): Wind farm output jumps from 30 MW to 120 MW. Manage surplus energy by charging batteries and, if needed, curtailing wind.
Tasks
- Pre-position resources. Before each scenario, review the forecast and pre-charge batteries, adjust gas turbine setpoints, and pre-stage DR notifications.
- Maintain frequency. Keep frequency within 49.9 - 50.1 Hz at all times. The dashboard shows a real-time frequency trace and your AGC performance score.
- Manage battery SOC. Do not deplete batteries before the evening peak. A good strategy reserves at least 50% SOC for the 5-7 PM solar cliff.
- Activate DR. Send OpenADR events to the data center and EV fleet when generation is insufficient. Practice the full notification -> opt-in -> dispatch -> reporting cycle.
- Minimize cost. The simulation calculates your total operating cost based on gas turbine fuel, battery cycling degradation, and DR incentive payments. Aim for the lowest cost while maintaining reliability.
Scoring
- Frequency compliance: % of time within +/- 0.1 Hz (target: > 99%)
- Voltage compliance: % of buses within limits (target: > 99%)
- Renewable utilization: % of available renewable energy captured (target: > 95%)
- Total cost: Lower is better
- DR performance: Baseline accuracy and response speed
This exercise uses the Grid Simulator. Click the Launch button below to open the Grid Operator Challenge lab.
Open Hands-on Lab
Complete the exercise in the live dashboard.
Log in to track your progress and earn certifications.