Hands-on: Balance a 1 GW Grid

⚙️ Module 4: Grid Operations

Hands-on: Balance a 1 GW Grid

In this hands-on exercise, you will operate a simulated 1 GW power grid, managing generation, storage, and demand response to maintain frequency and voltage within limits over a 24-hour accelerated simulation.

Exercise Overview

The simulated grid represents a mid-size utility with the following resources:

  • 2 Gas turbines: 200 MW each, ramp rate 10 MW/min, minimum stable 80 MW
  • 1 Solar farm: 300 MW nameplate, output follows a realistic irradiance profile with cloud transients
  • 1 Wind farm: 150 MW nameplate, output follows a variable wind profile
  • 2 Battery systems: 50 MW / 200 MWh each (4-hour duration)
  • 1 Data center: 100 MW load, 20% curtailable via workload migration
  • EV charging fleet: 50 MW peak, fully curtailable via OCPP
  • Residential/commercial load: 500 MW base, peaks at 700 MW

Total generation capacity: 900 MW (firm) + 450 MW (variable renewable) = 1,350 MW nameplate

Peak load: ~850 MW

Scenarios You Will Face

The 24-hour simulation (compressed to 30 minutes real time) includes:

  1. Morning solar ramp (6-9 AM): Solar output increases from 0 to 250 MW. Manage gas turbine ramp-down and battery charging to avoid over-frequency.
  1. Cloud event (11 AM): Solar output drops 150 MW in 2 minutes due to cloud cover. Batteries must respond within seconds; gas turbines ramp up over minutes.
  1. Afternoon peak (2-5 PM): Load reaches 850 MW while solar begins declining. Dispatch batteries, curtail EV charging, and activate data center DR.
  1. Evening solar cliff (5-7 PM): Solar drops from 200 MW to 0 in 2 hours. Gas turbines at maximum, batteries discharging. If load exceeds generation, you must curtail demand.
  1. Wind surge (midnight): Wind farm output jumps from 30 MW to 120 MW. Manage surplus energy by charging batteries and, if needed, curtailing wind.

Tasks

  1. Pre-position resources. Before each scenario, review the forecast and pre-charge batteries, adjust gas turbine setpoints, and pre-stage DR notifications.
  1. Maintain frequency. Keep frequency within 49.9 - 50.1 Hz at all times. The dashboard shows a real-time frequency trace and your AGC performance score.
  1. Manage battery SOC. Do not deplete batteries before the evening peak. A good strategy reserves at least 50% SOC for the 5-7 PM solar cliff.
  1. Activate DR. Send OpenADR events to the data center and EV fleet when generation is insufficient. Practice the full notification -> opt-in -> dispatch -> reporting cycle.
  1. Minimize cost. The simulation calculates your total operating cost based on gas turbine fuel, battery cycling degradation, and DR incentive payments. Aim for the lowest cost while maintaining reliability.

Scoring

  • Frequency compliance: % of time within +/- 0.1 Hz (target: > 99%)
  • Voltage compliance: % of buses within limits (target: > 99%)
  • Renewable utilization: % of available renewable energy captured (target: > 95%)
  • Total cost: Lower is better
  • DR performance: Baseline accuracy and response speed

This exercise uses the Grid Simulator. Click the Launch button below to open the Grid Operator Challenge lab.